Statement of Qualifications:
Flow-Accelerated Corrosion
Qualifications
As the leading firm in Flow-Accelerated
Corrosion (FAC) consulting, we provide over 25,000 hours of consulting to our FAC clients annually. For over ten years,
we have solved FAC problems
at nuclear and fossil stations. Our credentials include:
-
The largest staff
of FAC experts in the US, including former utility FAC Engineers.
-
Unparalleled
expertise; nationally recognized, published experts with experience
at over 65 nuclear units and 75 man-years
of FAC experience.
-
Members of EPRI's
CHECWORKS User's Group (CHUG) since 1994.
-
Contracted to served as the Corporate FAC
Program Manager for a major electric utility, providing ongoing FAC support to ten
nuclear and five fossil units.
- Developed over sixtyCHECMATE/CHECUP/CHECWORKS predictive models.
- Edited EPRI’s handbook Flow-Accelerated Corrosion in Power Plants
(both editions).
FAC Services
CSI provides technical support in all aspects of FAC programs. Our most
popular services include:
-
SFA
2.x conversions
-
Power
uprate FAC analysis
-
CHECWORKS
Pass 2 Analysis and CHECUP modeling
-
FAC
procedure development
-
FAC
training
-
Independent technical
assessments
-
FAC
outage support
FAC Products
CSI has developed several products designed to streamline the FAC Engineer's
duties:
-
FAC
Manager, sophisticated FAC program management
and trending software.
-
FACnet,
the method to connect with other FAC Engineers from across the globe.
-
FAC
Turnover Kit, an introduction to FAC for new FAC Engineers.
Significant Projects
Our projects have included the following:
- Selected as the sole provider of FAC consulting services to Energy Nuclear
Northeast
- SFA Conversions: Over 30 completed SFA conversion projects
- Power Uprate Studies: Quantification of the effect on FAC of proposed
power uprates
or other plant modifications at 15 different units over the last 18 months.
- Support of FAC Manager, FAC software
in use at 54 nuclear and 35 fossil units to maintain the program basis, plan and schedule inspections,
evaluate UT data, and provide for multi-site information exchange.
- Assisted LaSalle Station in developing a complete FAC program that was
subsequently recognized by INPO as excellent.
- Restart and ongoing support to Fort Calhoun Station after a steam line
rupture.
- An oxygen distribution study for a BWR plant to improve the correlation
between predicted and measured FAC wear rates.
For more information, please contact us at 847/836-3000. |